Capacity
7.00 MW
Mapped total
Tendring · Essex · Eastern · England
Capacity
7.00 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Green Farm (Wix Manningtree) is an operational solar site in Tendring · Essex · Eastern · England with 7.00 MW of mapped capacity operated by Hive Energy.