Capacity
5.00 MW
Mapped total
Aberdeenshire · Grampian · Scotland · Scotland
Capacity
5.00 MW
Mapped total
Status
Pipeline
Current state
Energy source
Battery
Mapped fuel group
Bankhead Recycling - Solar Array, Battery Storage & Hydrogen is an pipeline battery site in Aberdeenshire · Grampian · Scotland · Scotland with 5.00 MW of mapped capacity operated by Bankhead Renewable Energy Limited.