Capacity
400 MW
Mapped total
Boston · Lincolnshire · East Midlands · England
Capacity
400 MW
Mapped total
Status
Pipeline
Current state
Energy source
Battery
Mapped fuel group
Bicker Fen Bess, Vicarage Drove - Battery Storage is an pipeline battery site in Boston · Lincolnshire · East Midlands · England with 400 MW of mapped capacity operated by FRV TH Powertek Limited.