Power siteBattery asset

Gaywood Farm

Sevenoaks · Kent · South East · England

Mapped capacity
7.50 MW
Status
Inactive
Energy source
Battery

Capacity

7.50 MW

Mapped total

Status

Inactive

Current state

Energy source

Battery

Mapped fuel group

Power Source: Battery

Gaywood Farm is an inactive battery site in Sevenoaks · Kent · South East · England with 7.50 MW of mapped capacity operated by AMDC Energy / Balanced Grid Solutions.

Postcode[object Object]
CountyKent
RegionSouth East
CountryEngland

Site facts

Status
Inactive
Energy source
Battery
Mapped capacity
7.50 MW
Operator
AMDC Energy / Balanced Grid Solutions
Commissioned
2018
Address
Land South Of Gaywood Farm, Hole Lane, Edenbridge, Kent