Capacity
7.50 MW
Mapped total
Sevenoaks · Kent · South East · England
Capacity
7.50 MW
Mapped total
Status
Inactive
Current state
Energy source
Battery
Mapped fuel group
Gaywood Farm is an inactive battery site in Sevenoaks · Kent · South East · England with 7.50 MW of mapped capacity operated by AMDC Energy / Balanced Grid Solutions.