Capacity
6.00 MW
Mapped total
Eastleigh · Hampshire · South East · England
Capacity
6.00 MW
Mapped total
Status
Pipeline
Current state
Energy source
Battery
Mapped fuel group
Hamble Lane Battery Energy Storage is an pipeline battery site in Eastleigh · Hampshire · South East · England with 6.00 MW of mapped capacity operated by Conrad Energy (Developments) Limited.