Capacity
40.0 MW
Mapped total
Darlington · Cleveland · North East · England
Capacity
40.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Battery
Mapped fuel group
Long Pasture Farm, Little Stainton - Solar Farm is an pipeline battery site in Darlington · Cleveland · North East · England with 40.0 MW of mapped capacity operated by Electric Works.