Capacity
0.20 MW
Mapped total
Surrey Heath · Surrey · South East · England
Capacity
0.20 MW
Mapped total
Status
Pipeline
Current state
Energy source
Battery
Mapped fuel group
Lucas Green Road - Micro Energy Storage System is an pipeline battery site in Surrey Heath · Surrey · South East · England with 0.20 MW of mapped capacity operated by AMP Clean Energy.