Capacity
49.9 MW
Mapped total
Rotherham · South Yorkshire · Yorkshire and Humber · England
Capacity
49.9 MW
Mapped total
Status
Operational
Current state
Energy source
Battery
Mapped fuel group
Nether Moor Field is an operational battery site in Rotherham · South Yorkshire · Yorkshire and Humber · England with 49.9 MW of mapped capacity operated by Thurcroft Energy (Max Design Consultancy).