Power siteBiomass asset

Cumbernauld BioPlant (Waste AD)

North Lanarkshire · Strathclyde · Scotland · Scotland

Mapped capacity
2.40 MW
Status
Operational
Energy source
Biomass

Capacity

2.40 MW

Mapped total

Status

Operational

Current state

Energy source

Biomass

Mapped fuel group

Power Source: Biomass

Cumbernauld BioPlant (Waste AD) is an operational biomass site in North Lanarkshire · Strathclyde · Scotland · Scotland with 2.40 MW of mapped capacity operated by Shanks Group.

CountyStrathclyde
RegionScotland
CountryScotland

Site facts

Status
Operational
Energy source
Biomass
Mapped capacity
2.40 MW
Operator
Shanks Group
Commissioned
2011
Address
Shanks Landfill Site Meikle Drumgray Road Greengairs Airdrie Lanarkshire