Capacity
1.40 MW
Mapped total
Barking and Dagenham · London · London · England
Capacity
1.40 MW
Mapped total
Status
Operational
Current state
Energy source
Biomass
Mapped fuel group
Dagenham Docks Biogas (Waste AD) is an operational biomass site in Barking and Dagenham · London · London · England with 1.40 MW of mapped capacity operated by Lynton Development / Teg Environmental.