Capacity
1.20 MW
Mapped total
Breckland · Norfolk · Eastern · England
Capacity
1.20 MW
Mapped total
Status
Pipeline
Current state
Energy source
Biomass
Mapped fuel group
Kenninghall Renewable Energy Facility (Waste AD) is an pipeline biomass site in Breckland · Norfolk · Eastern · England with 1.20 MW of mapped capacity operated by Greenshoots Energy.