Capacity
6.50 MW
Mapped total
North Kesteven · Lincolnshire · East Midlands · England
Capacity
6.50 MW
Mapped total
Status
Operational
Current state
Energy source
Biomass
Mapped fuel group
Metheringham Heath (Farm AD) is an operational biomass site in North Kesteven · Lincolnshire · East Midlands · England with 6.50 MW of mapped capacity operated by Future Biogas (Blankney Estate).