Capacity
2.40 MW
Mapped total
Torfaen · Gwent · Wales · Wales
Capacity
2.40 MW
Mapped total
Status
Inactive
Current state
Energy source
Biomass
Mapped fuel group
New Inn AD (Waste AD) is an inactive biomass site in Torfaen · Gwent · Wales · Wales with 2.40 MW of mapped capacity operated by Shanks Group.