Capacity
3.00 MW
Mapped total
Bridgend · Mid Glamorgan · Wales · Wales
Capacity
3.00 MW
Mapped total
Status
Operational
Current state
Energy source
Biomass
Mapped fuel group
Stormy Down (Waste AD) is an operational biomass site in Bridgend · Mid Glamorgan · Wales · Wales with 3.00 MW of mapped capacity operated by Severn Trent (formerly Agrivert).