Power siteBiomass asset

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility

Moray · Aberdeenshire · Scotland · Scotland

Mapped capacity
4.00 MW
Status
Pipeline
Energy source
Biomass

Capacity

4.00 MW

Mapped total

Status

Pipeline

Current state

Energy source

Biomass

Mapped fuel group

Power Source: Biomass

The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility is an pipeline biomass site in Moray · Aberdeenshire · Scotland · Scotland with 4.00 MW of mapped capacity operated by Grisasan Engineering Services Limited.

Postcode[object Object]
CountyAberdeenshire
RegionScotland
CountryScotland

Site facts

Status
Pipeline
Energy source
Biomass
Mapped capacity
4.00 MW
Operator
Grisasan Engineering Services Limited
Commissioned
2024
Address
150 Metres To The W/O The Portgordon, Maltings, Buckie