Capacity
2.20 MW
Mapped total
Aberdeenshire · Grampian · Scotland · Scotland
Capacity
2.20 MW
Mapped total
Status
Operational
Current state
Energy source
Gas
Mapped fuel group
Black Dog is an operational gas site in Aberdeenshire · Grampian · Scotland · Scotland with 2.20 MW of mapped capacity operated by FCC Environment.