Capacity
4.50 MW
Mapped total
Thurrock · Essex · Eastern · England
Capacity
4.50 MW
Mapped total
Status
Operational
Current state
Energy source
Gas
Mapped fuel group
Ockendon 'B' Landfill Scheme is an operational gas site in Thurrock · Essex · Eastern · England with 4.50 MW of mapped capacity operated by Haul Waste Disposal Ltd.