Capacity
2.00 MW
Mapped total
Highland · Highland · Scotland · Scotland
Capacity
2.00 MW
Mapped total
Status
Pipeline
Current state
Energy source
Hydro
Mapped fuel group
Lochaber Hydro Development (Scheme 3) is an pipeline hydro site in Highland · Highland · Scotland · Scotland with 2.00 MW of mapped capacity operated by Simec Lochaber Hydropower 2.