Capacity
0.90 MW
Mapped total
Scotland · Scotland
Capacity
0.90 MW
Mapped total
Status
Operational
Current state
Energy source
Hydro
Mapped fuel group
Upper Falloch is an operational hydro site in Scotland · Scotland with 0.90 MW of mapped capacity operated by Temporis Capital.
Location not published for this power site yet.