Power siteSolar asset

Alloa Wastewater Treatment Works, Bowhouse Road - Solar Panels

Clackmannanshire · Clackmannanshire · Scotland · Scotland

Mapped capacity
0.95 MW
Status
Pipeline
Energy source
Solar

Capacity

0.95 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Alloa Wastewater Treatment Works, Bowhouse Road - Solar Panels is an pipeline solar site in Clackmannanshire · Clackmannanshire · Scotland · Scotland with 0.95 MW of mapped capacity operated by Scottish Water.

Postcode[object Object]
CountyClackmannanshire
RegionScotland
CountryScotland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
0.95 MW
Operator
Scottish Water
Commissioned
2023
Address
Alloa Wastewater Treatment Works Bowhouse Road