Power siteSolar asset

Baker Barracks Solar Development

Chichester · Hampshire · South East · England

Mapped capacity
1.50 MW
Status
Pipeline
Energy source
Solar

Capacity

1.50 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Baker Barracks Solar Development is an pipeline solar site in Chichester · Hampshire · South East · England with 1.50 MW of mapped capacity operated by Defence Estates Infrastructure Organisation.

Postcode[object Object]
CountyHampshire
RegionSouth East
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
1.50 MW
Operator
Defence Estates Infrastructure Organisation
Commissioned
2021
Address
Baker Barracks, Emsworth Road, Emsworth