Capacity
3.00 MW
Mapped total
Aberdeenshire · Grampian · Scotland · Scotland
Capacity
3.00 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Bankhead Recycling - Solar Array, Battery Storage & Hydrogen is an pipeline solar site in Aberdeenshire · Grampian · Scotland · Scotland with 3.00 MW of mapped capacity operated by Bankhead Renewable Energy Limited.