Capacity
400 MW
Mapped total
The Planning Inspectorate - National Infrastructure · Lincolnshire · East Midlands · England
Capacity
400 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Beacon Fen Energy Park is an pipeline solar site in The Planning Inspectorate - National Infrastructure · Lincolnshire · East Midlands · England with 400 MW of mapped capacity operated by Low Carbon Limited.