Capacity
0.58 MW
Mapped total
Maidstone · Kent · South East · England
Capacity
0.58 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Berry Gardens, Redwall Lane - Solar Panels is an pipeline solar site in Maidstone · Kent · South East · England with 0.58 MW of mapped capacity operated by Beba Energy Limited.