Capacity
0.34 MW
Mapped total
West Lothian · West Lothian · Scotland · Scotland
Capacity
0.34 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Blackburn Waste Water Treatrment, Redhouse Road - Solar Panels is an pipeline solar site in West Lothian · West Lothian · Scotland · Scotland with 0.34 MW of mapped capacity operated by Scottish Water.