Capacity
0.20 MW
Mapped total
Huntingdonshire · Cambridgeshire · Eastern · England
Capacity
0.20 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Bridge Farm, Earith Fen Drove - Solar Panels is an pipeline solar site in Huntingdonshire · Cambridgeshire · Eastern · England with 0.20 MW of mapped capacity operated by Private Developer.