Capacity
0.67 MW
Mapped total
Cheshire East · Cheshire · North West · England
Capacity
0.67 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Bridgemere Garden Centre,London Road - Solar Panels is an pipeline solar site in Cheshire East · Cheshire · North West · England with 0.67 MW of mapped capacity operated by Blue Diamond Limited.