Capacity
19.0 MW
Mapped total
Carmarthenshire · Carmarthenshire · Wales · Wales
Capacity
19.0 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Bryncoch Solar Farm is an inactive solar site in Carmarthenshire · Carmarthenshire · Wales · Wales with 19.0 MW of mapped capacity operated by Green Energy UK Direct.