Capacity
1.29 MW
Mapped total
Shropshire · Shropshire · West Midlands · England
Capacity
1.29 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Cefn-Y-Maes Farm, Rhydycroesau - Solar Park is an pipeline solar site in Shropshire · Shropshire · West Midlands · England with 1.29 MW of mapped capacity operated by Positech Energy Limited.