Capacity
5.00 MW
Mapped total
Flintshire · Flintshire · Wales · Wales
Capacity
5.00 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Celyn Farm is an inactive solar site in Flintshire · Flintshire · Wales · Wales with 5.00 MW of mapped capacity operated by Earthworm/ EW Capital.