Power siteSolar asset

Chemring Countermeasures Limited, High Post Road- Solar Array

Wiltshire · Wiltshire · South West · England

Mapped capacity
0.25 MW
Status
Pipeline
Energy source
Solar

Capacity

0.25 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Chemring Countermeasures Limited, High Post Road- Solar Array is an pipeline solar site in Wiltshire · Wiltshire · South West · England with 0.25 MW of mapped capacity operated by Chemring Countermeasures.

Postcode[object Object]
CountyWiltshire
RegionSouth West
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
0.25 MW
Operator
Chemring Countermeasures
Commissioned
2024
Address
Chapel At Netton East C292 To High Post Road, Salisbury