Capacity
0.25 MW
Mapped total
Wiltshire · Wiltshire · South West · England
Capacity
0.25 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Chemring Countermeasures Limited, High Post Road- Solar Array is an pipeline solar site in Wiltshire · Wiltshire · South West · England with 0.25 MW of mapped capacity operated by Chemring Countermeasures.