Capacity
5.00 MW
Mapped total
Cornwall · Cornwall · South West · England
Capacity
5.00 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Chester Energy (East Woolley Farm) is an operational solar site in Cornwall · Cornwall · South West · England with 5.00 MW of mapped capacity operated by Chester Energy (Eastcott).