Capacity
49.9 MW
Mapped total
Sevenoaks · Kent · South East · England
Capacity
49.9 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Chimmens Solar Farm is an inactive solar site in Sevenoaks · Kent · South East · England with 49.9 MW of mapped capacity operated by RES Limited.