Capacity
49.9 MW
Mapped total
Great Britain
Capacity
49.9 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Cossans Solar/BESS Project is an pipeline solar site in Great Britain with 49.9 MW of mapped capacity operated by TRIO POWER LIMITED.
Location not published for this power site yet.