Capacity
0.71 MW
Mapped total
South Ayrshire · Strathclyde · Scotland · Scotland
Capacity
0.71 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Craig Tara Holiday Park, Dunure Road - Solar Panels is an pipeline solar site in South Ayrshire · Strathclyde · Scotland · Scotland with 0.71 MW of mapped capacity operated by Bourne Leisure Limited.