Power siteSolar asset

Cuckoo Grove Farm

Pembrokeshire · Dyfed · Wales · Wales

Mapped capacity
6.10 MW
Status
Operational
Energy source
Solar

Capacity

6.10 MW

Mapped total

Status

Operational

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Cuckoo Grove Farm is an operational solar site in Pembrokeshire · Dyfed · Wales · Wales with 6.10 MW of mapped capacity operated by Foresight.

Postcode[object Object]
CountyDyfed
RegionWales
CountryWales

Site facts

Status
Operational
Energy source
Solar
Mapped capacity
6.10 MW
Operator
Foresight
Commissioned
2015
Address
Land to the North of Cuckoo Grove Farm, Cuckoo Lane, Haverfordwest, SA61 2UY