Power siteSolar asset

Docking Farm Solar

Broadland · Norfolk · Eastern · England

Mapped capacity
28.0 MW
Status
Pipeline
Energy source
Solar

Capacity

28.0 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Docking Farm Solar is an pipeline solar site in Broadland · Norfolk · Eastern · England with 28.0 MW of mapped capacity operated by Metka EGN Projects Limited.

CountyNorfolk
RegionEastern
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
28.0 MW
Operator
Metka EGN Projects Limited
Commissioned
2022
Address
Land North Of The Street, Cawston, Norwich,