Capacity
14.0 MW
Mapped total
Peterborough · Cambridgeshire · Eastern · England
Capacity
14.0 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Dogsthorpe, Welland Road - Solar Farm & Battery Storage is an pipeline solar site in Peterborough · Cambridgeshire · Eastern · England with 14.0 MW of mapped capacity operated by Infinis Solar Developments Limited.