Power siteSolar asset

East Stour Solar Farm

Ashford · Kent · South East · England

Mapped capacity
49.9 MW
Status
Pipeline
Energy source
Solar

Capacity

49.9 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

East Stour Solar Farm is an pipeline solar site in Ashford · Kent · South East · England with 49.9 MW of mapped capacity operated by EDF Energy Renewables.

Postcode[object Object]
CountyKent
RegionSouth East
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
49.9 MW
Operator
EDF Energy Renewables
Address
Land south of M20 and south of railway line to the east and west of, Church Lane, Aldington