Capacity
0.21 MW
Mapped total
North Lincolnshire · Lincolnshire · Yorkshire and Humber · England
Capacity
0.21 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Frederick Gough School, Grange Lane South - Solar Panels is an pipeline solar site in North Lincolnshire · Lincolnshire · Yorkshire and Humber · England with 0.21 MW of mapped capacity operated by North Lincolnshire Council.