Capacity
10.7 MW
Mapped total
Tandridge · Kent · South East · England
Capacity
10.7 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Gaywood Solar Farm - Solar Farm is an pipeline solar site in Tandridge · Kent · South East · England with 10.7 MW of mapped capacity operated by KYBO Solar Limited.