Capacity
0.29 MW
Mapped total
East Riding of Yorkshire · East Riding of Yorkshire · Yorkshire and Humber · England
Capacity
0.29 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Greenlands Farm, Barmby Moor - Solar Photovoltaic Arrays is an pipeline solar site in East Riding of Yorkshire · East Riding of Yorkshire · Yorkshire and Humber · England with 0.29 MW of mapped capacity operated by R S Cockerill Limited.