Capacity
12.5 MW
Mapped total
Cheshire East · Cheshire · North West · England
Capacity
12.5 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Hatherton Lodge Farm, Hunsterson Road - Solar Farm is an pipeline solar site in Cheshire East · Cheshire · North West · England with 12.5 MW of mapped capacity operated by Noventum Power Limited.