Capacity
5.00 MW
Mapped total
Thurrock · Essex · Eastern · England
Capacity
5.00 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Land adjacent to the former Coryton Refinery is an inactive solar site in Thurrock · Essex · Eastern · England with 5.00 MW of mapped capacity operated by S4N Worsted/Gamma Energy Exeter.