Capacity
3.50 MW
Mapped total
Basingstoke and Deane · Hampshire · South East · England
Capacity
3.50 MW
Mapped total
Status
Inactive
Current state
Energy source
Solar
Mapped fuel group
Land South of Shothanger Works is an inactive solar site in Basingstoke and Deane · Hampshire · South East · England with 3.50 MW of mapped capacity operated by Solar Planning.