Capacity
7.50 MW
Mapped total
North East Derbyshire · Derbyshire · East Midlands · England
Capacity
7.50 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Langer Lane Solar Farm is an pipeline solar site in North East Derbyshire · Derbyshire · East Midlands · England with 7.50 MW of mapped capacity operated by Ethical Power Development Limited.