Capacity
0.27 MW
Mapped total
East Cambridgeshire · Cambridgeshire · Eastern · England
Capacity
0.27 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Lees Packhouse, The Gault - Solar PV System is an pipeline solar site in East Cambridgeshire · Cambridgeshire · Eastern · England with 0.27 MW of mapped capacity operated by BeBa Energy UK Limited.