Capacity
0.45 MW
Mapped total
Central Bedfordshire · Bedfordshire · Eastern · England
Capacity
0.45 MW
Mapped total
Status
Pipeline
Current state
Energy source
Solar
Mapped fuel group
Leighton Linslade Water Recycling Centre - PV Array is an pipeline solar site in Central Bedfordshire · Bedfordshire · Eastern · England with 0.45 MW of mapped capacity operated by Anglian Water Services Limited.