Power siteSolar asset

Long Barrow Solar Farm Project

East Cambridgeshire · Cambridgeshire · Eastern · England

Mapped capacity
49.9 MW
Status
Pipeline
Energy source
Solar

Capacity

49.9 MW

Mapped total

Status

Pipeline

Current state

Energy source

Solar

Mapped fuel group

Power Source: Solar

Long Barrow Solar Farm Project is an pipeline solar site in East Cambridgeshire · Cambridgeshire · Eastern · England with 49.9 MW of mapped capacity operated by Low Carbon Solar Park 42 Limited.

CountyCambridgeshire
RegionEastern
CountryEngland

Site facts

Status
Pipeline
Energy source
Solar
Mapped capacity
49.9 MW
Operator
Low Carbon Solar Park 42 Limited
Address
N/O New England Farm, Heath Road, Swaffham Bulbeck, Cambridge