Capacity
5.50 MW
Mapped total
East Hampshire · Hampshire · South East · England
Capacity
5.50 MW
Mapped total
Status
Operational
Current state
Energy source
Solar
Mapped fuel group
Marsh House Solar Park is an operational solar site in East Hampshire · Hampshire · South East · England with 5.50 MW of mapped capacity operated by Constantine Land Ltd.